DreamLine DL-6514C-01CL Installation Guide

Browse online or download Installation Guide for Unknown DreamLine DL-6514C-01CL. DreamLine DL-6514C-01CL Installation Guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
AquaLux Shower Door & Base Kit
SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Page view 0
1 2 3 4 5 6 ... 27 28

Summary of Contents

Page 1 - IT INSTALLATION INSTRUCTIONS

AquaLux Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alt

Page 2 - AQUALUX

Rev 2.2 9 10. Get three measurements: • from the top edge of the Glass door (02) to the top edge of the upper Hinge (06); • from the bottom edge of th

Page 3 - Tools Required

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Page 4 - Packing List

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Page 5 - Shower/Tub Door Installation

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Page 6 - Rev 2.2

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Page 7

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Page 8

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Page 9 - Fig. 10

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Page 10 - Fig. 12

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Page 11 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Page 12 - Preparation

Rev 2.2 1 AQUALUX SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at

Page 13 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Page 14

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Page 15

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Page 16 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Page 17 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Page 18 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Page 19

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Page 20

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Page 21

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Page 22

Rev 2.2 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in t

Page 23

Rev 2.2 3Detailed Diagram of Tub Door Components Packing List 01 Stationary glass 1pc 07 Wall Anchor 3pcs 02 Support bar 1pc 08 Round head s

Page 24

Rev 2.2 4Shower/Tub Door Installation 1. Assemble the Wall brackets (06) onto the Stationary glass (01). See Fig. 1 for details.

Page 25

Rev 2.2 5 3. Outline the position of the Wall brackets (06) on the wall. Set the Stationary glass (01) aside. Remove the Wall bracket from the Statio

Page 26 - Product maintenance

Rev 2.2 6 5. Mark the drilling hole on the threshold for Bottom bracket (11). Set the Stationary glass (01) aside. Drill the hole in the threshold us

Page 27 - WARRANTYSERVICE

Rev 2.2 7 7. Locate the Support bar (02). Adjust the bar to a proper position on the glass and the wall. Level it horizontally. Hold it firmly and ou

Page 28 - BATHAUTHORITY.COM

Rev 2.2 8 Fig. 9 9. Install the Handle (05) onto the Glass door (04). Attach the Bottom anti-water strip (10) over the

Comments to this Manuals

No comments